Installation Completion Form

Jemss Trading Pty Ltd.
ABN: 57 656 410 641

Installation Completion Form

"*" indicates required fields

Customer Information

Installation Details

DD dash MM dash YYYY
DD dash MM dash YYYY

Installation Checklist

  • All uprights/columns installed plumb, no twist, levels checked.
  • All beams/arms installed correctly at specified levels as per drawing. (if no drawing, installed at levels agreed with the customer onsite.)
  • Layout changes communicated to the sales team, and load rating updated if necessary.
  • All safety pins in place.
  • All floor fixings installed correctly.
  • Site cleaned post-installation; all waste disposed of.
  • Safe working load sign(s) placed on every row; photos taken.
  • All work carried out safely.
MM slash DD slash YYYY
MM slash DD slash YYYY
Note:

If the customer does not complete and sign this form within 7 days of receipt, the team at Gold Coast Racking will record the installation as with no-follow-up issues or concerns.