Gold Coast Racking

600M Temporary Fencing Package With Portable Panels, Bases and Clamps

$15,150.00 (inc. GST)

SKU: GCR-600MTPP Category:
Quantity
Overall SizePipeFinishPanel weight
2100mm H x 2400mm W32mm OD / 1.4mm thicknessHot dipped galvanised14KG +/- 1KG

Commitment to Quality

Safety First Approach

Customer Satisfaction Guaranteed

Australian Designed

245 x Panels + 245 x Concrete Bases + 245 x Clamps

2.1 x 2.4m 3mm mesh Temporary Fencing Panel

  • 2100mm H x 2400mm W
  • Finish: Hot dipped galvanised
  • Mesh: 3mm thick
  • Pipe: 32mm OD / 1.4mm thickness
  • Aperture of Anti Climb
  • Mesh weld: 150mm x 60mm
  • Panel weight 14KG +/- 1KG
  • Hand welded for optimum strength
  • An average of over 28 microns /m2

Concrete Filled Base

  • 611mm x 230mm x 150mm
  • Concrete filled -26.25kg
  • Colour: Safety Orange
  • Hole size- to suit 32mm OD pipe
  • UV Resistant/Anti Ageing

Clamp

  • 100mm centre to centre
  • Suit for 32mm OD pipe
  • Hot dipped galvanised
  • Easy to use

1. Report return requests within 14 business days of receiving your purchase.

2. Include the invoice, packing slip, or proof of purchase with your return request.

3. Please allow 14 business days for the processing of damaged or missing items.

4. The return is accepted within 14 days of delivery date in their original sealed packaging. In case the customer returns due to change of mind, a re-stock fee equal to 15% applies.

5. It is not possible to claim back the shipping charges that originally incurred to ship the item to the customer. It will be at the cost of the customer returning it.

6. Any exchange has to be of the same or lesser value; otherwise, some extra charges will be applicable as well.

7. Once the order is ready for dispatch, any change of mind by the customer will result in a 25% packing and admin fee being applied.

kindly fill this form for your inquiry, We will get in touch with you soon!

Product Inquiry

"*" indicates required fields

Hidden

Garage Shelving Installation Policy

  • Hand unloading and stairs fees will apply if applicable.
  • Installation is subject to the floor being cleared before our team arrives.
  • A cleaning and waste removal fee will apply if necessary.